{"id":9265,"date":"2024-04-30T13:55:46","date_gmt":"2024-04-30T17:55:46","guid":{"rendered":"https:\/\/minaguas.gob.ve\/?p=9265"},"modified":"2024-04-30T13:56:58","modified_gmt":"2024-04-30T17:56:58","slug":"90-metros-de-tuberia-para-colectores-mixtos-seran-instalados-en-la-concordia-estado-tachira","status":"publish","type":"post","link":"https:\/\/minaguas.gob.ve\/?p=9265","title":{"rendered":"90 metros de tuber\u00eda para colectores mixtos ser\u00e1n instalados en La Concordia estado T\u00e1chira"},"content":{"rendered":"<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1000\" height=\"563\" src=\"https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2024\/04\/WhatsApp-Image-2024-04-30-at-12.28.02-PM-1.jpeg\" alt=\"\" class=\"wp-image-9266\" \/><\/figure>\n<\/div>\n\n\n<p><\/p>\n\n\n\n<p><strong>(Prensa MinAguas \/ Hidrosuroeste 30-04-2024).-<\/strong> Un total de 90 metros lineales de tuber\u00eda llegaron a la ciudad de San Crist\u00f3bal, para ser instalados en la obra de colectores mixtos que se ejecuta en la parroquia La Concordia, la cual permitir\u00e1 beneficiar a 250 familias.<\/p>\n\n\n\n<p>La Fuerza Trabajadora de Hidrosuroeste realiz\u00f3 las excavaciones para hacer la sustituci\u00f3n del material en la avenida Marginal del Torbes, para as\u00ed cumplir con el compromiso de mejorar de manera \u00f3ptima los colectores de aguas servidas en la entidad.<\/p>\n\n\n\n<p>Una de las habitantes de la comunidad de La Concordia, Carmen Alicia Contreras, expres\u00f3 \u00abgracias al presidente Nicol\u00e1s Maduro por apoyarnos en este proyecto que es tan importante para nosotros y a el Poder Popular que ha supervisado junto a Hidrosuroeste para que todo llegue a un feliz t\u00e9rmino\u00bb.<\/p>\n\n\n\n<p>Estas acciones forman parte de los planes de la empresa para brindar respuesta a los reportes del 1X10 del Buen Gobierno, de acuerdo con lo emanado por el presidente Nicol\u00e1s Maduro y en trabajo articulado con el Ministerio del Poder Popular de Atenci\u00f3n de las Aguas, la alcald\u00eda de San Crist\u00f3bal y la gobernaci\u00f3n del estado.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1000\" height=\"563\" data-id=\"9267\" src=\"https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2024\/04\/WhatsApp-Image-2024-04-30-at-12.28.02-PM.jpeg\" alt=\"\" class=\"wp-image-9267\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1280\" height=\"720\" data-id=\"9268\" src=\"https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2024\/04\/WhatsApp-Image-2024-04-30-at-12.28.03-PM.jpeg\" alt=\"\" class=\"wp-image-9268\" \/><\/figure>\n<\/figure>\n","protected":false},"excerpt":{"rendered":"<p>(Prensa MinAguas \/ Hidrosuroeste 30-04-2024).- Un total de 90 metros lineales de tuber\u00eda llegaron a la ciudad de San Crist\u00f3bal, para ser instalados en la obra de colectores mixtos que se ejecuta en la parroquia La Concordia, la cual permitir\u00e1 beneficiar a 250 familias. La Fuerza Trabajadora de Hidrosuroeste realiz\u00f3 las excavaciones para hacer la [&hellip;]<\/p>\n","protected":false},"author":28,"featured_media":9266,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[77,75,144,24,45],"class_list":["post-9265","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticias","tag-aguas-servidas","tag-dotacion","tag-hidrosuroeste","tag-pueblo-trabajador-del-agua","tag-regionales"],"_links":{"self":[{"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/9265","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/28"}],"replies":[{"embeddable":true,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=9265"}],"version-history":[{"count":0,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/9265\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/9266"}],"wp:attachment":[{"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=9265"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=9265"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=9265"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}