{"id":9081,"date":"2024-04-24T16:04:41","date_gmt":"2024-04-24T20:04:41","guid":{"rendered":"https:\/\/minaguas.gob.ve\/?p=9081"},"modified":"2024-04-24T16:08:10","modified_gmt":"2024-04-24T20:08:10","slug":"minaguas-entrego-1-608-metros-de-tuberia-para-continuar-obras-en-el-acueducto-la-mulata","status":"publish","type":"post","link":"https:\/\/minaguas.gob.ve\/?p=9081","title":{"rendered":"MinAguas entreg\u00f3 1.608 metros de tuber\u00eda para continuar obras en el acueducto La Mulata"},"content":{"rendered":"\n<figure class=\"wp-block-embed is-type-rich is-provider-twitter wp-block-embed-twitter\"><div class=\"wp-block-embed__wrapper\">\nhttps:\/\/twitter.com\/RMarcoTorres\/status\/1782927942412066845\n<\/div><\/figure>\n\n\n\n<p><strong>(Prensa MinAguas \/ Hidrosuroeste 24-04-2024).-<\/strong> El Ministerio del Poder Popular de Atenci\u00f3n de las Aguas (MinAguas), realiz\u00f3 la entrega de mil 608 metros de tuber\u00eda PEAD de 6 pulgadas a Hidrosuroeste, destinados a la construcci\u00f3n del ramal de alimentaci\u00f3n al acueducto La Mulata, ubicado en el municipio Pedro Mar\u00eda Ure\u00f1a del estado T\u00e1chira, para atender a m\u00e1s de 65 mil familias del eje fronterizo.<\/p>\n\n\n\n<p>A la fecha se reporta un 95 % de avance en esta obra que se lleva a cabo por instrucciones del presidente de la Rep\u00fablica, Nicol\u00e1s Maduro y en articulaci\u00f3n con el gobernador de la entidad Freddy Bernal, la cual contempla la rehabilitaci\u00f3n integral de la estaci\u00f3n cloradora La Mulata, la construcci\u00f3n de un dique toma y cuatro puentes tubo, as\u00ed como la excavaci\u00f3n e instalaci\u00f3n de los 8 kil\u00f3metros de aducci\u00f3n de alimentaci\u00f3n del caudal de agua hacia la parte baja de la poblaci\u00f3n de Ure\u00f1a.<\/p>\n\n\n\n<p>\u201cEstamos recibiendo en La Mulata la quinta gandola de tuber\u00eda, para completar un total de cinco mil 800 metros lineales que, a su vez, componen los 8 kil\u00f3metros que van desde el tramo monta\u00f1oso de La Mulata hasta la entrada de la poblaci\u00f3n de Ure\u00f1a, donde ser\u00e1 interconectada a la red de distribuci\u00f3n de agua potable\u201d, explic\u00f3 el presidente de Hidrosuroeste, ingeniero Arqu\u00edmedes Uzc\u00e1tegui.<\/p>\n\n\n\n<p>Por su parte, la vocera del consejo comunal Villa Camila, Lilia Mar\u00eda Garc\u00eda, manifest\u00f3 que \u201cse va a beneficiar toda La Mulata y Ure\u00f1a donde habitan 65 mil familias. Gracias al presidente Nicol\u00e1s Maduro Moros por el apoyo con la entrega de tuber\u00eda para realizar este proyecto\u201d.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"588\" src=\"https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2024\/04\/WhatsApp-Image-2024-04-24-at-3.45.24-PM.jpeg\" alt=\"\" class=\"wp-image-9082\" \/><\/figure>\n<\/div>\n\n\n<p>Asimismo, en la estaci\u00f3n cloradora se realizaron labores de recuperaci\u00f3n de la infraestructura con el arreglo las mallas, pintura de rejas, desmontaje e instalaci\u00f3n de techos, vaciado de concreto en la rampa de acceso principal y acera lateral.<\/p>\n\n\n\n<p>De la misma forma, la Fuerza Trabajadora de la hidrol\u00f3gica regional junto con la Corporaci\u00f3n de Industrias Mineras del T\u00e1chira (Coimta), iniciaron los trabajos de evalu\u00f3 del \u00e1rea del acueducto y de sus zonas aleda\u00f1as para la colocaci\u00f3n de asfalto, como parte del punto y c\u00edrculo que abarca las mejoras integrales para todo el sector de La Mulata y en atenci\u00f3n a los reportes de las comunidades a trav\u00e9s del 1&#215;10 del Buen Gobierno.<\/p>\n\n\n\n<p>A trav\u00e9s de estos trabajos se concretan las acciones que se han ejecutado en el marco de las pol\u00edticas de mejoramiento del sistema h\u00eddrico en el estado T\u00e1chira, a trav\u00e9s del MinAguas, el cual suministra los insumos necesarios para la concretar los objetivos h\u00eddricos, guiados por las directrices del presidente de la Rep\u00fablica, Nicol\u00e1s Maduro.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"2560\" height=\"1441\" data-id=\"9083\" src=\"https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2024\/04\/WhatsApp-Image-2024-04-24-at-3.39.24-PM.jpeg\" alt=\"\" class=\"wp-image-9083\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"2560\" height=\"1441\" data-id=\"9084\" src=\"https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2024\/04\/WhatsApp-Image-2024-04-24-at-3.39.24-PM-1.jpeg\" alt=\"\" class=\"wp-image-9084\" \/><\/figure>\n<\/figure>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-2 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"2560\" height=\"1920\" data-id=\"9085\" src=\"https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2024\/04\/IMG-20240422-WA0079.jpg\" alt=\"\" class=\"wp-image-9085\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"547\" height=\"563\" data-id=\"9086\" src=\"https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2024\/04\/WhatsApp-Image-2024-04-24-at-2.19.18-PM.jpeg\" alt=\"\" class=\"wp-image-9086\" \/><\/figure>\n<\/figure>\n","protected":false},"excerpt":{"rendered":"<p>(Prensa MinAguas \/ Hidrosuroeste 24-04-2024).- El Ministerio del Poder Popular de Atenci\u00f3n de las Aguas (MinAguas), realiz\u00f3 la entrega de mil 608 metros de tuber\u00eda PEAD de 6 pulgadas a Hidrosuroeste, destinados a la construcci\u00f3n del ramal de alimentaci\u00f3n al acueducto La Mulata, ubicado en el municipio Pedro Mar\u00eda Ure\u00f1a del estado T\u00e1chira, para atender [&hellip;]<\/p>\n","protected":false},"author":28,"featured_media":9088,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[103,42,144,173,24,45,145,172],"class_list":["post-9081","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticias","tag-1x10","tag-agua-potable","tag-hidrosuroeste","tag-la-mulata-2","tag-pueblo-trabajador-del-agua","tag-regionales","tag-tachira","tag-urena"],"_links":{"self":[{"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/9081","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/28"}],"replies":[{"embeddable":true,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=9081"}],"version-history":[{"count":0,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/9081\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/9088"}],"wp:attachment":[{"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=9081"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=9081"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=9081"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}