{"id":7812,"date":"2024-02-28T15:37:19","date_gmt":"2024-02-28T19:37:19","guid":{"rendered":"https:\/\/minaguas.gob.ve\/?p=7812"},"modified":"2024-02-28T15:37:19","modified_gmt":"2024-02-28T19:37:19","slug":"hidrocapital-culmino-con-exito-reparacion-de-tuberia-matriz-en-el-hatillo","status":"publish","type":"post","link":"https:\/\/minaguas.gob.ve\/?p=7812","title":{"rendered":"Hidrocapital culmin\u00f3 con \u00e9xito reparaci\u00f3n de tuber\u00eda matriz en El Hatillo"},"content":{"rendered":"<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"2560\" height=\"1706\" src=\"https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2024\/02\/32294e5a-e8b8-42ee-911b-b790f191a56a.jpeg\" alt=\"\" class=\"wp-image-7813\" \/><\/figure>\n<\/div>\n\n\n<p><\/p>\n\n\n\n<p><strong>(Prensa MinAguas \/ Hidrocapital 28-02-2024).- <\/strong>Una poblaci\u00f3n de m\u00e1s de 249 mil habitantes de los municipios El Hatillo, Sucre y Baruta, fueron atendidos por la Hidrol\u00f3gica de la Regi\u00f3n Capital, C. A. (Hidrocapital), tras la reparaci\u00f3n de una aver\u00eda que se gener\u00f3 el pasado domingo 18 de febrero, a las 4:00 a. m. en la tuber\u00eda matriz de 30 pulgadas, ubicada en el sector La Toma, avenida principal de La Guairita, municipio El Hatillo del estado Miranda.<\/p>\n\n\n\n<p>La Fuerza Trabajadora de Hidrocapital, se despleg\u00f3 con todos sus especialistas y en menos de 60 horas se logr\u00f3 solventar la situaci\u00f3n de manera exitosa. Adem\u00e1s, durante la jornada, se utilizaron retroexcavadoras y jumbos para ampliar la zanja y ubicar la tuber\u00eda lo antes posible.<\/p>\n\n\n\n<p>De manera simult\u00e1nea, se corrigi\u00f3 una aver\u00eda en un colector de aguas servidas de 8 pulgadas, con la sustituci\u00f3n de 12 metros lineales de tuber\u00eda. Asimismo, se hicieron trabajos de relleno y compactaci\u00f3n, con unos 200 metros c\u00fabicos de tierra utilizada para colmar nuevamente el terreno y recuperar en su totalidad la vialidad.<\/p>\n\n\n\n<p>Estas acciones se realizan en cumplimiento de las orientaciones emanadas del presidente de la Rep\u00fablica, Nicol\u00e1s Maduro, para optimizar los servicios p\u00fablicos en el pa\u00eds y mejorar la calidad de vida de los venezolanos.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"2560\" height=\"1706\" data-id=\"7814\" src=\"https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2024\/02\/b0faeb87-e383-4570-8592-6e710386f6bb.jpeg\" alt=\"\" class=\"wp-image-7814\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1600\" height=\"1200\" data-id=\"7815\" src=\"https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2024\/02\/WhatsApp-Image-2024-02-28-at-3.36.37-PM.jpeg\" alt=\"\" class=\"wp-image-7815\" \/><\/figure>\n<\/figure>\n","protected":false},"excerpt":{"rendered":"<p>(Prensa MinAguas \/ Hidrocapital 28-02-2024).- Una poblaci\u00f3n de m\u00e1s de 249 mil habitantes de los municipios El Hatillo, Sucre y Baruta, fueron atendidos por la Hidrol\u00f3gica de la Regi\u00f3n Capital, C. A. (Hidrocapital), tras la reparaci\u00f3n de una aver\u00eda que se gener\u00f3 el pasado domingo 18 de febrero, a las 4:00 a. m. en la [&hellip;]<\/p>\n","protected":false},"author":28,"featured_media":7815,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[42,36,8,24],"class_list":["post-7812","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticias","tag-agua-potable","tag-hidrocapital","tag-nacionales","tag-pueblo-trabajador-del-agua"],"_links":{"self":[{"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/7812","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/28"}],"replies":[{"embeddable":true,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=7812"}],"version-history":[{"count":0,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/7812\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/7815"}],"wp:attachment":[{"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=7812"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=7812"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=7812"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}