{"id":4723,"date":"2022-07-13T12:15:52","date_gmt":"2022-07-13T16:15:52","guid":{"rendered":"https:\/\/minaguas.gob.ve\/?p=4723"},"modified":"2022-07-13T12:15:52","modified_gmt":"2022-07-13T16:15:52","slug":"hidrocapital-culmino-con-exito-mantenimiento-en-sistema-tuy-iii","status":"publish","type":"post","link":"https:\/\/minaguas.gob.ve\/?p=4723","title":{"rendered":"Hidrocapital culmin\u00f3 con \u00e9xito mantenimiento en sistema Tuy III"},"content":{"rendered":"<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2022\/07\/photo_5075971764537895787_y-1024x768.jpg\" alt=\"\" class=\"wp-image-4724\" srcset=\"https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2022\/07\/photo_5075971764537895787_y-1024x768.jpg 1024w, https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2022\/07\/photo_5075971764537895787_y-300x225.jpg 300w, https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2022\/07\/photo_5075971764537895787_y-768x576.jpg 768w, https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2022\/07\/photo_5075971764537895787_y.jpg 1280w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/div>\n\n\n<p><em>Con estas labores se logr\u00f3 la incorporaci\u00f3n de 500 litros de agua por segundo a la red de distribuci\u00f3n<\/em><\/p>\n\n\n\n<p><strong>(Prensa MinAguas\/Hidrocapital 13-07-2022).-<\/strong> Este martes concluyeron los trabajos de rehabilitaci\u00f3n, mantenimiento correctivo y preventivo, programados por Hidrocapital y el ministerio del Poder Popular de Atenci\u00f3n de las Aguas en el sistema de producci\u00f3n Tuy III y se efectuaron las maniobras para la reactivaci\u00f3n del servicio, todo esto en cumplimiento del Mapa de Soluciones y la Agenda Concreta de Acciones instruida por el presidente Nicol\u00e1s Maduro Moros para fortalecer la distribuci\u00f3n de agua potable.<\/p>\n\n\n\n<p>Las obras de mantenimiento se llevaron a cabo durante 48 horas continuas, de manera simult\u00e1nea en los estados La Guaira, Miranda y Distrito Capital; para ello se establecieron varios frentes de trabajo y se incorporaron 460 trabajadores de la Hidrol\u00f3gica, adem\u00e1s de un equipo de Corpoelec, quienes realizaron reparaciones de fugas y aver\u00edas, sustituci\u00f3n de tuber\u00edas, cambio de v\u00e1lvulas, ventosas y bombas de llenado, limpieza en la planta potabilizadora de Caujarito, revisi\u00f3n y control preventivo en 4 sub estaciones el\u00e9ctricas e instalaci\u00f3n de motores en las estaciones de bombeo 31, 32 y 33.<\/p>\n\n\n\n<p>Con esta intervenci\u00f3n, se logr\u00f3 la recuperaci\u00f3n de 500 litros de agua que ser\u00e1n incorporados a la red de distribuci\u00f3n, para beneficiar a 2 millones 800 mil habitantes que son surtidos a trav\u00e9s de este sistema, aumentar la confiabilidad del suministro y garantizar su \u00f3ptimo funcionamiento.\u00a0<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2022\/07\/photo_5075971764537895786_y-1.jpg\" alt=\"\" class=\"wp-image-4726\" width=\"590\" height=\"664\" srcset=\"https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2022\/07\/photo_5075971764537895786_y-1.jpg 853w, https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2022\/07\/photo_5075971764537895786_y-1-267x300.jpg 267w, https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2022\/07\/photo_5075971764537895786_y-1-768x864.jpg 768w\" sizes=\"auto, (max-width: 590px) 100vw, 590px\" \/><\/figure>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Con estas labores se logr\u00f3 la incorporaci\u00f3n de 500 litros de agua por segundo a la red de distribuci\u00f3n (Prensa MinAguas\/Hidrocapital 13-07-2022).- Este martes concluyeron los trabajos de rehabilitaci\u00f3n, mantenimiento correctivo y preventivo, programados por Hidrocapital y el ministerio del Poder Popular de Atenci\u00f3n de las Aguas en el sistema de producci\u00f3n Tuy III y [&hellip;]<\/p>\n","protected":false},"author":28,"featured_media":4724,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[8],"class_list":["post-4723","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticias","tag-nacionales"],"_links":{"self":[{"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/4723","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/28"}],"replies":[{"embeddable":true,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4723"}],"version-history":[{"count":0,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/4723\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/4724"}],"wp:attachment":[{"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4723"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=4723"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=4723"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}