{"id":4283,"date":"2022-05-31T15:35:56","date_gmt":"2022-05-31T19:35:56","guid":{"rendered":"https:\/\/minaguas.gob.ve\/?p=4283"},"modified":"2022-05-31T15:35:56","modified_gmt":"2022-05-31T19:35:56","slug":"fuerza-trabajadora-de-hidrocapital-instalo-nueva-turbina-en-estacion-cloradora-de-tacata","status":"publish","type":"post","link":"https:\/\/minaguas.gob.ve\/?p=4283","title":{"rendered":"Fuerza trabajadora de Hidrocapital instal\u00f3 nueva turbina en estaci\u00f3n cloradora de T\u00e1cata"},"content":{"rendered":"<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"627\" height=\"344\" src=\"https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2022\/05\/WhatsApp-Image-2022-05-31-at-3.30.29-PM.jpeg\" alt=\"\" class=\"wp-image-4284\" srcset=\"https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2022\/05\/WhatsApp-Image-2022-05-31-at-3.30.29-PM.jpeg 627w, https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2022\/05\/WhatsApp-Image-2022-05-31-at-3.30.29-PM-300x165.jpeg 300w\" sizes=\"auto, (max-width: 627px) 100vw, 627px\" \/><\/figure>\n<\/div>\n\n\n<p><em>Estas labores contaron con la colaboraci\u00f3n de la Gobernaci\u00f3n del estado Miranda y la Alcald\u00eda del municipio Guaicaipuro<\/em><\/p>\n\n\n\n<p><strong>(Prensa MinAguas\/Hidrocapital 31-05-2022).-<\/strong> El personal del Acueducto Altos Mirandinos de Hidrocapital realiz\u00f3 la instalaci\u00f3n de una nueva turbina en la estaci\u00f3n cloradora ubicada en la parroquia T\u00e1cata, municipio Guaicaipuro del estado Miranda,\u00a0para potenciar la distribuci\u00f3n del vital l\u00edquido a los habitantes de esta localidad.<br>La fuerza trabajadora cont\u00f3 con la colaboraci\u00f3n de la Gobernaci\u00f3n del estado Miranda y la Alcald\u00eda del municipio Guaicaipuro, entes que contribuyeron con maquinaria pesada y otros insumos para completar esta tarea.<\/p>\n\n\n\n<p>Entre los trabajos que acompa\u00f1aron el montaje de este dispositivo, se efectu\u00f3 el ensamblaje del grupo de bombeo que comprende el motor vertical de 115hp y la turbina a colocar con las mismas especificaciones t\u00e9cnicas.<\/p>\n\n\n\n<p>Asimismo, se realiz\u00f3 la prueba en el tablero de control y arranque del grupo de bombeo, para verificar que los valores de tensi\u00f3n y corriente se encontraran en los rangos de operatividad establecidos.<\/p>\n\n\n\n<p>Con estos trabajos, el personal de Hidrocapital, bajo el liderazgo de su presidente, C\/C Harol Clemente, cumple con la misi\u00f3n de mantener en \u00f3ptimo estado toda la infraestructura h\u00eddrica que administra, cumpliendo as\u00ed las instrucciones del presidente de la Rep\u00fablica, Nicol\u00e1s Maduro; del vicepresidente sectorial de Obras P\u00fablicas y Servicios, G\/J N\u00e9stor Reverol, y del ministro del Poder Popular de Atenci\u00f3n de las Aguas, G\/D Rodolfo Marco Torres, en el marco del Mapa de Soluciones y la Agenda Concreta de Acci\u00f3n.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"354\" height=\"512\" data-id=\"4287\" src=\"https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2022\/05\/WhatsApp-Image-2022-05-31-at-3.30.27-PM-1.jpeg\" alt=\"\" class=\"wp-image-4287\" srcset=\"https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2022\/05\/WhatsApp-Image-2022-05-31-at-3.30.27-PM-1.jpeg 354w, https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2022\/05\/WhatsApp-Image-2022-05-31-at-3.30.27-PM-1-207x300.jpeg 207w\" sizes=\"auto, (max-width: 354px) 100vw, 354px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"480\" height=\"560\" data-id=\"4288\" src=\"https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2022\/05\/WhatsApp-Image-2022-05-31-at-3.30.35-PM-1.jpeg\" alt=\"\" class=\"wp-image-4288\" srcset=\"https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2022\/05\/WhatsApp-Image-2022-05-31-at-3.30.35-PM-1.jpeg 480w, https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2022\/05\/WhatsApp-Image-2022-05-31-at-3.30.35-PM-1-257x300.jpeg 257w\" sizes=\"auto, (max-width: 480px) 100vw, 480px\" \/><\/figure>\n<\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Estas labores contaron con la colaboraci\u00f3n de la Gobernaci\u00f3n del estado Miranda y la Alcald\u00eda del municipio Guaicaipuro (Prensa MinAguas\/Hidrocapital 31-05-2022).- El personal del Acueducto Altos Mirandinos de Hidrocapital realiz\u00f3 la instalaci\u00f3n de una nueva turbina en la estaci\u00f3n cloradora ubicada en la parroquia T\u00e1cata, municipio Guaicaipuro del estado Miranda,\u00a0para potenciar la distribuci\u00f3n del vital [&hellip;]<\/p>\n","protected":false},"author":28,"featured_media":4284,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[8],"class_list":["post-4283","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticias","tag-nacionales"],"_links":{"self":[{"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/4283","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/28"}],"replies":[{"embeddable":true,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4283"}],"version-history":[{"count":0,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/4283\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/4284"}],"wp:attachment":[{"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4283"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=4283"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=4283"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}