{"id":15972,"date":"2026-06-25T10:27:53","date_gmt":"2026-06-25T14:27:53","guid":{"rendered":"https:\/\/minaguas.gob.ve\/?p=15972"},"modified":"2026-06-25T10:27:53","modified_gmt":"2026-06-25T14:27:53","slug":"gobierno-bolivariano-consolida-el-sistema-hidrico-de-paraguana-con-avance-del-95-en-subestacion-crucero-adicora","status":"publish","type":"post","link":"https:\/\/minaguas.gob.ve\/?p=15972","title":{"rendered":"Gobierno Bolivariano consolida el sistema h\u00eddrico de Paraguan\u00e1 con avance del 95% en subestaci\u00f3n Crucero-Ad\u00edcora"},"content":{"rendered":"\n<p><em>Esta obra permitir\u00e1 la independizaci\u00f3n de los operativos que se atienden para 32.000 familias del municipio Falc\u00f3n<\/em><\/p>\n\n\n\n<p><strong>(Prensa Ministerio de las Aguas &#8211; 23-06-2026). \u2013<\/strong> En el marco del plan de optimizaci\u00f3n del suministro de agua potable en Falc\u00f3n, el Ministerio del Poder Popular de las Aguas (MinAguas), a trav\u00e9s de Hidroven, inspeccion\u00f3 los significativos avances en la construcci\u00f3n de la subestaci\u00f3n de bombeo \u201cCrucero-Ad\u00edcora\u201d.<\/p>\n\n\n\n<p>Esta obra, que se desarrolla dentro de las instalaciones de la Estaci\u00f3n de Bombeo Los Olivos (Eblos), ubicada en el sector Los Olivos del municipio Falc\u00f3n, representa un paso fundamental para fortalecer el derecho humano al agua en esta entidad.<\/p>\n\n\n\n<p>Las obras civiles del sistema Crucero-Ad\u00edcora alcanzan hoy un 95% de ejecuci\u00f3n. Este sistema est\u00e1 dise\u00f1ado para atender a 5 de las 9 parroquias del municipio Falc\u00f3n, impactando positivamente a comunidades como: Ad\u00edcora, Sup\u00ed, Buchuaco, Tiraya, Pueblo Nuevo, El Hato, El V\u00ednculo, San Jos\u00e9, Miraca, Maquigua, Baraived, Azaro y Santa Rita.<\/p>\n\n\n\n<p>En total, se estima que m\u00e1s de 32.000 familias ser\u00e1n las principales atendidas con la optimizaci\u00f3n del servicio.<\/p>\n\n\n\n<p>Entre las actividades ejecutadas se destaca la construcci\u00f3n de una caseta para el resguardo del tablero de potencia y control de motores de 250 HP, as\u00ed como la protecci\u00f3n del transformador de 750 kVA. Asimismo, se avanza en la instalaci\u00f3n de un banco de transformadores y la construcci\u00f3n de una estaci\u00f3n de bombeo equipada con tres motores horizontales de 250 HP y bombas centr\u00edfugas con capacidad de 90 litros por segundo cada una. La obra tambi\u00e9n contempla la fabricaci\u00f3n de m\u00faltiples l\u00edneas de descarga y succi\u00f3n con tuber\u00eda de acero al carbono y la sustituci\u00f3n por etapas de la tuber\u00eda de 16 pulgadas de di\u00e1metro de este sistema.<\/p>\n\n\n\n<p>La subestaci\u00f3n Crucero-Ad\u00edcora no solo transformar\u00e1 la capacidad operativa del sistema h\u00eddrico en el municipio Falc\u00f3n, sino que permitir\u00e1 la independizaci\u00f3n de los operativos que se atienden desde el eje Crucero-Ad\u00edcora. Con esta nueva infraestructura, el sistema Eblos ofrecer\u00e1 una mayor compensaci\u00f3n en el env\u00edo de agua, fortaleciendo el caudal hacia el sistema Isiro 3 y la Estaci\u00f3n de Bombeo Al\u00ed Primera (EbAP). Este refuerzo se traducir\u00e1 en un aumento significativo del suministro para los municipios Carirubana y Los Taques, atendiendo directamente a miles de familias que dependen de este servicio.<\/p>\n\n\n\n<p>Rehabilitaci\u00f3n del tanque de almacenamiento de Eblos garantizar\u00e1 el agua para la pen\u00ednsula<\/p>\n\n\n\n<p>Durante la inspecci\u00f3n, las autoridades verificaron el avance de otro frente de trabajo crucial: la rehabilitaci\u00f3n del tanque de almacenamiento de la estaci\u00f3n Eblos. Este componente es vital para la estabilidad del sistema, ya que permitir\u00e1 garantizar el almacenamiento y distribuci\u00f3n eficiente del agua en toda la pen\u00ednsula de Paraguan\u00e1. La intervenci\u00f3n en el tanque se ejecuta con el fin de asegurar la operatividad del sistema y la compensaci\u00f3n h\u00eddrica necesaria para atender la creciente demanda de la regi\u00f3n.<\/p>\n\n\n\n<p>Con estas acciones, el Gobierno Bolivariano, a trav\u00e9s de Minaguas e Hidroven, reafirma su compromiso con la recuperaci\u00f3n de la infraestructura h\u00eddrica en el estado Falc\u00f3n, priorizando el bienestar de las comunidades y el impulso del desarrollo tur\u00edstico y la Zona Econ\u00f3mica Especial de Paraguan\u00e1. La entrada en operaci\u00f3n de este sistema,adicionar\u00e1 un caudal de 180 litros por segundo desde Ad\u00edcora hasta Cabo San Rom\u00e1n, marcando un hito en la gesti\u00f3n del agua para la entidad.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1000\" height=\"750\" data-id=\"15978\" src=\"https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2026\/06\/WhatsApp-Image-2026-06-23-at-9.09.27-PM-1.jpeg\" alt=\"\" class=\"wp-image-15978\" srcset=\"https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2026\/06\/WhatsApp-Image-2026-06-23-at-9.09.27-PM-1.jpeg 1000w, https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2026\/06\/WhatsApp-Image-2026-06-23-at-9.09.27-PM-1-300x225.jpeg 300w, https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2026\/06\/WhatsApp-Image-2026-06-23-at-9.09.27-PM-1-768x576.jpeg 768w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1000\" height=\"750\" data-id=\"15981\" src=\"https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2026\/06\/WhatsApp-Image-2026-06-23-at-9.09.26-PM-3.jpeg\" alt=\"\" class=\"wp-image-15981\" srcset=\"https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2026\/06\/WhatsApp-Image-2026-06-23-at-9.09.26-PM-3.jpeg 1000w, https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2026\/06\/WhatsApp-Image-2026-06-23-at-9.09.26-PM-3-300x225.jpeg 300w, https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2026\/06\/WhatsApp-Image-2026-06-23-at-9.09.26-PM-3-768x576.jpeg 768w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/figure>\n<\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1000\" height=\"750\" src=\"https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2026\/06\/WhatsApp-Image-2026-06-23-at-9.09.26-PM-1-1.jpeg\" alt=\"\" class=\"wp-image-15980\" srcset=\"https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2026\/06\/WhatsApp-Image-2026-06-23-at-9.09.26-PM-1-1.jpeg 1000w, https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2026\/06\/WhatsApp-Image-2026-06-23-at-9.09.26-PM-1-1-300x225.jpeg 300w, https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2026\/06\/WhatsApp-Image-2026-06-23-at-9.09.26-PM-1-1-768x576.jpeg 768w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Esta obra permitir\u00e1 la independizaci\u00f3n de los operativos que se atienden para 32.000 familias del municipio Falc\u00f3n (Prensa Ministerio de las Aguas &#8211; 23-06-2026). \u2013 En el marco del plan de optimizaci\u00f3n del suministro de agua potable en Falc\u00f3n, el Ministerio del Poder Popular de las Aguas (MinAguas), a trav\u00e9s de Hidroven, inspeccion\u00f3 los significativos [&hellip;]<\/p>\n","protected":false},"author":27,"featured_media":15977,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[42,254,152,45],"class_list":["post-15972","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticias","tag-agua-potable","tag-equipo-multidisciplinario-del-agua","tag-falcon","tag-regionales"],"_links":{"self":[{"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/15972","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/27"}],"replies":[{"embeddable":true,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=15972"}],"version-history":[{"count":1,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/15972\/revisions"}],"predecessor-version":[{"id":15982,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/15972\/revisions\/15982"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/15977"}],"wp:attachment":[{"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=15972"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=15972"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=15972"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}