{"id":15493,"date":"2026-06-05T15:38:04","date_gmt":"2026-06-05T19:38:04","guid":{"rendered":"https:\/\/minaguas.gob.ve\/?p=15493"},"modified":"2026-06-05T15:38:04","modified_gmt":"2026-06-05T19:38:04","slug":"gobierno-nacional-optimiza-suministro-de-agua-para-17-500-familias-de-anzoategui","status":"publish","type":"post","link":"https:\/\/minaguas.gob.ve\/?p=15493","title":{"rendered":"Gobierno Nacional optimiza suministro de agua para 17.500 familias de Anzo\u00e1tegui"},"content":{"rendered":"\n<p><em>A trav\u00e9s de un despliegue t\u00e9cnico, trabajadores de Hidroven ejecutaron labores de mantenimiento y mejoras estructurales en la planta potabilizadora Santa Clara y la estaci\u00f3n de bombeo Yai<\/em><\/p>\n\n\n\n<p><strong>(Prensa Ministerio de las Aguas &#8211; 05-06-2026).\u2013 <\/strong>Con el firme prop\u00f3sito de fortalecer el sistema h\u00eddrico en el estado Anzo\u00e1tegui, el Gobierno Bolivariano, a trav\u00e9s del Ministerio del Poder Popular de las Aguas (MinAguas) y la Hidrol\u00f3gica Venezolana (Hidroven), llev\u00f3 a cabo mantenimiento de la planta potabilizadora Santa Clara, ubicada en la parroquia Clarines del municipio Manuel Ezequiel Bruzual, logrando optimizar el suministro para aproximadamente 17.500 familias de la zona Oeste de la entidad.<\/p>\n\n\n\n<p>El plan contempl\u00f3 el corte y desincorporaci\u00f3n de dos v\u00e1lvulas de compuerta y tres v\u00e1lvulas check de 10 pulgadas de di\u00e1metro, que se encontraban inoperativas en el manifold de la l\u00ednea P\u00edritu. En su lugar, el personal especializado realiz\u00f3 el ensamblaje y colocaci\u00f3n de nuevos componentes de la misma dimensi\u00f3n, utilizando niples, empacaduras y pernos de alta resistencia para garantizar la total hermeticidad en las conexiones de las bridas.<\/p>\n\n\n\n<p>Asimismo, con el fin de garantizar un seguimiento preciso del sistema, se adecuaron tres puntos de medici\u00f3n de presi\u00f3n en la aducci\u00f3n de la l\u00ednea P\u00edritu mediante el acople de niples, anillos galvanizados, v\u00e1lvulas de paso r\u00e1pido y tres man\u00f3metros. De igual manera, se incorpor\u00f3 una ventosa de 2 pulgadas de di\u00e1metro en la l\u00ednea del equipo n\u00famero 2 y se aplic\u00f3 pintura anticorrosiva en todo el manifold para prolongar la durabilidad de la infraestructura.<\/p>\n\n\n\n<p>Simult\u00e1neamente, se llev\u00f3 a cabo la limpieza y mantenimiento en sedimentadores de la planta modular Santa Clara, as\u00ed como en las dos piscinas del desarenador pertenecientes a la estaci\u00f3n de bombeo Yai; con la ayuda de maquinaria pesada y herramientas especializadas.<\/p>\n\n\n\n<p>Estas labores forman parte de las pol\u00edticas que lidera el Gobierno Bolivariano para fortalecer el mapa de soluciones y la Agenda Concreta de Acci\u00f3n, consolidando as\u00ed la eficiencia de los servicios b\u00e1sicos en todo el territorio nacional.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"15500\" src=\"https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2026\/06\/WhatsApp-Image-2026-06-05-at-2.35.37-PM-3-1024x768.jpeg\" alt=\"\" class=\"wp-image-15500\" srcset=\"https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2026\/06\/WhatsApp-Image-2026-06-05-at-2.35.37-PM-3-1024x768.jpeg 1024w, https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2026\/06\/WhatsApp-Image-2026-06-05-at-2.35.37-PM-3-300x225.jpeg 300w, https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2026\/06\/WhatsApp-Image-2026-06-05-at-2.35.37-PM-3-768x576.jpeg 768w, https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2026\/06\/WhatsApp-Image-2026-06-05-at-2.35.37-PM-3.jpeg 1280w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"15499\" src=\"https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2026\/06\/WhatsApp-Image-2026-06-05-at-2.35.37-PM-1-1-1024x768.jpeg\" alt=\"\" class=\"wp-image-15499\" srcset=\"https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2026\/06\/WhatsApp-Image-2026-06-05-at-2.35.37-PM-1-1-1024x768.jpeg 1024w, https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2026\/06\/WhatsApp-Image-2026-06-05-at-2.35.37-PM-1-1-300x225.jpeg 300w, https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2026\/06\/WhatsApp-Image-2026-06-05-at-2.35.37-PM-1-1-768x576.jpeg 768w, https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2026\/06\/WhatsApp-Image-2026-06-05-at-2.35.37-PM-1-1.jpeg 1280w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"769\" height=\"1024\" data-id=\"15498\" src=\"https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2026\/06\/WhatsApp-Image-2026-06-05-at-2.35.37-PM-2-1-769x1024.jpeg\" alt=\"\" class=\"wp-image-15498\" srcset=\"https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2026\/06\/WhatsApp-Image-2026-06-05-at-2.35.37-PM-2-1-769x1024.jpeg 769w, https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2026\/06\/WhatsApp-Image-2026-06-05-at-2.35.37-PM-2-1-225x300.jpeg 225w, https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2026\/06\/WhatsApp-Image-2026-06-05-at-2.35.37-PM-2-1-768x1023.jpeg 768w, https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2026\/06\/WhatsApp-Image-2026-06-05-at-2.35.37-PM-2-1-1153x1536.jpeg 1153w, https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2026\/06\/WhatsApp-Image-2026-06-05-at-2.35.37-PM-2-1-1538x2048.jpeg 1538w, https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2026\/06\/WhatsApp-Image-2026-06-05-at-2.35.37-PM-2-1.jpeg 1736w\" sizes=\"auto, (max-width: 769px) 100vw, 769px\" \/><\/figure>\n<\/figure>\n","protected":false},"excerpt":{"rendered":"<p>A trav\u00e9s de un despliegue t\u00e9cnico, trabajadores de Hidroven ejecutaron labores de mantenimiento y mejoras estructurales en la planta potabilizadora Santa Clara y la estaci\u00f3n de bombeo Yai (Prensa Ministerio de las Aguas &#8211; 05-06-2026).\u2013 Con el firme prop\u00f3sito de fortalecer el sistema h\u00eddrico en el estado Anzo\u00e1tegui, el Gobierno Bolivariano, a trav\u00e9s del Ministerio [&hellip;]<\/p>\n","protected":false},"author":27,"featured_media":15497,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[42,70,254,45],"class_list":["post-15493","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticias","tag-agua-potable","tag-anzoategui","tag-equipo-multidisciplinario-del-agua","tag-regionales"],"_links":{"self":[{"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/15493","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/27"}],"replies":[{"embeddable":true,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=15493"}],"version-history":[{"count":1,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/15493\/revisions"}],"predecessor-version":[{"id":15501,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/15493\/revisions\/15501"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/15497"}],"wp:attachment":[{"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=15493"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=15493"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=15493"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}