{"id":1438,"date":"2021-11-01T15:13:07","date_gmt":"2021-11-01T19:13:07","guid":{"rendered":"https:\/\/minaguas.gob.ve\/?p=1438"},"modified":"2021-11-01T15:13:07","modified_gmt":"2021-11-01T19:13:07","slug":"hidrocapital-atendio-de-manera-inmediata-averia-en-el-boulevard-de-el-cafetal","status":"publish","type":"post","link":"https:\/\/minaguas.gob.ve\/?p=1438","title":{"rendered":"Hidrocapital atendi\u00f3 de manera inmediata aver\u00eda en el Boulevard de El Cafetal"},"content":{"rendered":"\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"772\" height=\"726\" src=\"https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2021\/11\/WhatsApp-Image-2021-11-01-at-3.10.04-PM-1.jpeg\" alt=\"\" class=\"wp-image-1439\" srcset=\"https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2021\/11\/WhatsApp-Image-2021-11-01-at-3.10.04-PM-1.jpeg 772w, https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2021\/11\/WhatsApp-Image-2021-11-01-at-3.10.04-PM-1-300x282.jpeg 300w, https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2021\/11\/WhatsApp-Image-2021-11-01-at-3.10.04-PM-1-768x722.jpeg 768w\" sizes=\"auto, (max-width: 772px) 100vw, 772px\" \/><\/figure><\/div>\n\n\n\n<p><strong><em>Cuadrillas de la hidrol\u00f3gica realizaron la sustituci\u00f3n de un tramo de tuber\u00eda de 12 pulgadas de di\u00e1metro<\/em><\/strong><\/p>\n\n\n\n<p><strong>(Prensa MinAguas\/Hidrocapital 01-11-2021).<\/strong>&#8211; Cuadrillas de Hidrocapital, ente adscrito al Ministerio del Poder Popular de Atenci\u00f3n de las Aguas, realizaron la sustituci\u00f3n de un tramo de tuber\u00eda de 12 pulgadas de di\u00e1metro en el Boulevard de El Cafetal, ubicado en el municipio Baruta, estado Miranda.<\/p>\n\n\n\n<p>La aver\u00eda fue reportada por vecinos del edificio Araira y fue atendida de manera inmediata por el personal del Acueducto Metropolitano, quienes procedieron a rotular y excavar un tramo aproximado de 3 metros de longitud, donde localizaron una rotura en el tubo matriz que suministra el vital l\u00edquido al lado sur de la avenida principal de El Cafetal.<\/p>\n\n\n\n<p>Los trabajos comenzaron a las 9:30 de la ma\u00f1ana del pasado domingo y se extendieron hasta las 3:30 de la madrugada de este lunes 1\u00b0 de noviembre. Durante este lapso de unas 18 horas de labores continuas, el equipo de trabajo de Hidrocapital procedi\u00f3 a colocar 2.60 metros de tuber\u00eda de acero de 12 pulgadas y dos juntas mec\u00e1nicas para solventar el problema.<\/p>\n\n\n\n<p>Finalizadas las labores correctivas, se restituy\u00f3 el servicio de agua potable hac\u00eda las 18 edificaciones y locales comerciales que se encuentran en esta zona del municipio Baruta.<\/p>\n\n\n\n<p>De esta manera, la Hidrol\u00f3gica de la Regi\u00f3n Capital, filial de Hidroven, da respuesta oportuna e inmediata a las comunidades que se encuentran en los estados La Guaira, Miranda y Distrito Capital.<\/p>\n\n\n\n<p><strong>R: Arturo Aguilera.<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-gallery columns-3 is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"1024\" src=\"https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2021\/11\/WhatsApp-Image-2021-11-01-at-3.10.04-PM-768x1024.jpeg\" alt=\"\" data-id=\"1440\" data-link=\"https:\/\/minaguas.gob.ve\/?attachment_id=1440\" class=\"wp-image-1440\" srcset=\"https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2021\/11\/WhatsApp-Image-2021-11-01-at-3.10.04-PM-768x1024.jpeg 768w, https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2021\/11\/WhatsApp-Image-2021-11-01-at-3.10.04-PM-225x300.jpeg 225w, https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2021\/11\/WhatsApp-Image-2021-11-01-at-3.10.04-PM.jpeg 774w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"1024\" src=\"https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2021\/11\/WhatsApp-Image-2021-11-01-at-3.10.03-PM-768x1024.jpeg\" alt=\"\" data-id=\"1441\" data-link=\"https:\/\/minaguas.gob.ve\/?attachment_id=1441\" class=\"wp-image-1441\" srcset=\"https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2021\/11\/WhatsApp-Image-2021-11-01-at-3.10.03-PM-768x1024.jpeg 768w, https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2021\/11\/WhatsApp-Image-2021-11-01-at-3.10.03-PM-225x300.jpeg 225w, https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2021\/11\/WhatsApp-Image-2021-11-01-at-3.10.03-PM.jpeg 810w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"1024\" src=\"https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2021\/11\/WhatsApp-Image-2021-11-01-at-3.10.04-PM-2-768x1024.jpeg\" alt=\"\" data-id=\"1442\" data-full-url=\"https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2021\/11\/WhatsApp-Image-2021-11-01-at-3.10.04-PM-2.jpeg\" data-link=\"https:\/\/minaguas.gob.ve\/?attachment_id=1442\" class=\"wp-image-1442\" srcset=\"https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2021\/11\/WhatsApp-Image-2021-11-01-at-3.10.04-PM-2-768x1024.jpeg 768w, https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2021\/11\/WhatsApp-Image-2021-11-01-at-3.10.04-PM-2-225x300.jpeg 225w, https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2021\/11\/WhatsApp-Image-2021-11-01-at-3.10.04-PM-2.jpeg 774w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><\/figure><\/li><\/ul><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Cuadrillas de la hidrol\u00f3gica realizaron la sustituci\u00f3n de un tramo de tuber\u00eda de 12 pulgadas de di\u00e1metro (Prensa MinAguas\/Hidrocapital 01-11-2021).&#8211; Cuadrillas de Hidrocapital, ente adscrito al Ministerio del Poder Popular de Atenci\u00f3n de las Aguas, realizaron la sustituci\u00f3n de un tramo de tuber\u00eda de 12 pulgadas de di\u00e1metro en el Boulevard de El Cafetal, ubicado [&hellip;]<\/p>\n","protected":false},"author":28,"featured_media":1439,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[8],"class_list":["post-1438","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticias","tag-nacionales"],"_links":{"self":[{"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/1438","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/28"}],"replies":[{"embeddable":true,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1438"}],"version-history":[{"count":0,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/1438\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/1439"}],"wp:attachment":[{"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1438"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1438"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1438"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}