{"id":13541,"date":"2026-03-06T17:36:00","date_gmt":"2026-03-06T21:36:00","guid":{"rendered":"https:\/\/minaguas.gob.ve\/?p=13541"},"modified":"2026-03-06T22:43:39","modified_gmt":"2026-03-07T02:43:39","slug":"gobierno-bolivariano-atiende-a-mas-de-2-100-familias-en-el-corredor-pueblos-caribe","status":"publish","type":"post","link":"https:\/\/minaguas.gob.ve\/?p=13541","title":{"rendered":"Gobierno Bolivariano atiende a m\u00e1s de 2.100 familias en el Corredor \u00abPueblos Caribe\u00bb"},"content":{"rendered":"\n<p>A trav\u00e9s de la Agenda Concreta de Acci\u00f3n, se instalaron 60 metros de colector de 6 pulgadas en el sector Bland\u00edn de la carretera Caracas \u2013 La Guaira<\/p>\n\n\n\n<p><strong>(Prensa Ministerio de las Aguas &#8211; 06-03-2026).\u2013<\/strong> En un despliegue de atenci\u00f3n directa, el Ministerio del Poder Popular de las Aguas (MinAguas) avanz\u00f3 en la optimizaci\u00f3n del sistema de distribuci\u00f3n de aguas servidas en el eje #4 del Corredor Comunal \u00abPueblos Caribe\u00bb, espec\u00edficamente en el sector Bland\u00edn, como parte de las pol\u00edticas en servicios p\u00fablicos liderada por el Presidente Nicol\u00e1s Maduro y la Presidenta encargada Delcy Rodr\u00edguez.<\/p>\n\n\n\n<p>Como parte de un plan de tres meses dise\u00f1ado para atender a 18 comunas del corredor, el Gobierno Bolivariano y las estructuras de base ejecutaron una obra de alto impacto que atiende directamente a 2.115 familias mediante la instalaci\u00f3n de 60 metros de colector para aguas servidas de 6 pulgadas de di\u00e1metro y una variante t\u00e9cnica para optimizar la descarga de aguas residuales. Estas labores, que integran una estrategia de articulaci\u00f3n popular, garantizan un impacto macro en la zona al asegurar la correcta disposici\u00f3n de las aguas servidas y la mejora de la vialidad.<\/p>\n\n\n\n<p>Por su parte, la enlace territorial del eje pol\u00edtico, Mar\u00eda Gonz\u00e1lez, resalt\u00f3 que la obra nace de la Agenda Concreta de Acci\u00f3n (ACA) y las Siete Transformaciones (7T) impulsadas por el Presidente Nicol\u00e1s Maduro. \u00abHicimos el levantamiento comunidad por comunidad para presentar este proyecto que hoy nos da victorias tempranas\u00bb, afirm\u00f3.<\/p>\n\n\n\n<p>La vocera de la comunidad Maracaibo Unido, Lidis Ortiz, celebr\u00f3 el fin de la incidencia de saneamiento en el sector. \u00abGracias al proyecto del Corredor Comunal se est\u00e1 logrando la canalizaci\u00f3n. Ha sido una interacci\u00f3n perfecta entre comunidad e instituci\u00f3n, donde los vecinos hemos apoyado activamente la ejecuci\u00f3n de los trabajos\u00bb, se\u00f1al\u00f3.<\/p>\n\n\n\n<p>En estricto cumplimiento de las pol\u00edticas orientadas a la Segunda Transformaci\u00f3n (2T): Independencia Plena, MinAguas no solo moderniza la infraestructura, sino que garantiza la soberan\u00eda sobre la eficiencia en la prestaci\u00f3n del servicio para el bienestar social de las familias en el sector Bland\u00edn de la v\u00eda Caracas \u2013 La Guaira.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"682\" data-id=\"13545\" src=\"https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2026\/03\/WhatsApp-Image-2026-03-06-at-10.36.56-PM-1-1024x682.jpeg\" alt=\"\" class=\"wp-image-13545\" srcset=\"https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2026\/03\/WhatsApp-Image-2026-03-06-at-10.36.56-PM-1-1024x682.jpeg 1024w, https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2026\/03\/WhatsApp-Image-2026-03-06-at-10.36.56-PM-1-300x200.jpeg 300w, https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2026\/03\/WhatsApp-Image-2026-03-06-at-10.36.56-PM-1-768x512.jpeg 768w, https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2026\/03\/WhatsApp-Image-2026-03-06-at-10.36.56-PM-1-1536x1024.jpeg 1536w, https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2026\/03\/WhatsApp-Image-2026-03-06-at-10.36.56-PM-1-2048x1365.jpeg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"682\" data-id=\"13544\" src=\"https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2026\/03\/WhatsApp-Image-2026-03-06-at-4.27.05-PM-3-1024x682.jpeg\" alt=\"\" class=\"wp-image-13544\" srcset=\"https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2026\/03\/WhatsApp-Image-2026-03-06-at-4.27.05-PM-3-1024x682.jpeg 1024w, https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2026\/03\/WhatsApp-Image-2026-03-06-at-4.27.05-PM-3-300x200.jpeg 300w, https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2026\/03\/WhatsApp-Image-2026-03-06-at-4.27.05-PM-3-768x512.jpeg 768w, https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2026\/03\/WhatsApp-Image-2026-03-06-at-4.27.05-PM-3.jpeg 1280w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"682\" data-id=\"13543\" src=\"https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2026\/03\/WhatsApp-Image-2026-03-06-at-4.27.04-PM-1-1024x682.jpeg\" alt=\"\" class=\"wp-image-13543\" srcset=\"https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2026\/03\/WhatsApp-Image-2026-03-06-at-4.27.04-PM-1-1024x682.jpeg 1024w, https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2026\/03\/WhatsApp-Image-2026-03-06-at-4.27.04-PM-1-300x200.jpeg 300w, https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2026\/03\/WhatsApp-Image-2026-03-06-at-4.27.04-PM-1-768x512.jpeg 768w, https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2026\/03\/WhatsApp-Image-2026-03-06-at-4.27.04-PM-1.jpeg 1280w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n","protected":false},"excerpt":{"rendered":"<p>A trav\u00e9s de la Agenda Concreta de Acci\u00f3n, se instalaron 60 metros de colector de 6 pulgadas en el sector Bland\u00edn de la carretera Caracas \u2013 La Guaira (Prensa Ministerio de las Aguas &#8211; 06-03-2026).\u2013 En un despliegue de atenci\u00f3n directa, el Ministerio del Poder Popular de las Aguas (MinAguas) avanz\u00f3 en la optimizaci\u00f3n del [&hellip;]<\/p>\n","protected":false},"author":27,"featured_media":13542,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[77,8,24],"class_list":["post-13541","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticias","tag-aguas-servidas","tag-nacionales","tag-pueblo-trabajador-del-agua"],"_links":{"self":[{"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/13541","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/27"}],"replies":[{"embeddable":true,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=13541"}],"version-history":[{"count":1,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/13541\/revisions"}],"predecessor-version":[{"id":13546,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/13541\/revisions\/13546"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/13542"}],"wp:attachment":[{"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=13541"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=13541"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=13541"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}