{"id":10818,"date":"2024-07-08T09:33:21","date_gmt":"2024-07-08T13:33:21","guid":{"rendered":"https:\/\/minaguas.gob.ve\/?p=10818"},"modified":"2024-07-08T09:33:21","modified_gmt":"2024-07-08T13:33:21","slug":"reactivada-planta-potabilizadora-san-lorenzo-en-cumanacoa","status":"publish","type":"post","link":"https:\/\/minaguas.gob.ve\/?p=10818","title":{"rendered":"Reactivada planta potabilizadora San Lorenzo en Cumanacoa"},"content":{"rendered":"\n<p><em>La puesta en funcionamiento del sistema h\u00eddrico comprendi\u00f3 la construcci\u00f3n de dos fuentes de captaci\u00f3n de agua en el r\u00edo Manzanares, para obtener el 100 % de caudal e iniciar la potabilizaci\u00f3n del vital l\u00edquido.<\/em><\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"960\" height=\"540\" data-id=\"10821\" src=\"https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2024\/07\/WhatsApp-Image-2024-07-08-at-08.12.02-1.jpeg\" alt=\"\" class=\"wp-image-10821\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"987\" height=\"620\" data-id=\"10822\" src=\"https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2024\/07\/WhatsApp-Image-2024-07-08-at-09.16.04.jpeg\" alt=\"\" class=\"wp-image-10822\" \/><\/figure>\n<\/figure>\n\n\n\n<p><strong>(Prensa MinAguas \/ HidroCaribe 08-07-2024)-.<\/strong> El Gobierno Nacional a trav\u00e9s del ministerio del Poder Popular de Atenci\u00f3n de las Aguas (MinAguas), liderado por el ministro, G\/D Rodolfo Marco Torres, anunci\u00f3 la puesta en funcionamiento de la planta potabilizadora San Lorenzo, con una producci\u00f3n de 200 litros por segundo (LPS), suministrando el servicio h\u00eddrico a la poblaci\u00f3n de Cumanacoa en el municipio Montes del estado Sucre.<\/p>\n\n\n\n<p>El l\u00edder ministerial, inform\u00f3 que luego de una jornada continua de 72 horas, se concret\u00f3 la construcci\u00f3n de dos captaciones de agua y la rehabilitaci\u00f3n del sistema de cloraci\u00f3n de la planta con la instalaci\u00f3n de piezas y v\u00e1lvulas nuevas, para iniciar operaciones tras las respectivas pruebas t\u00e9cnicas que garantizan la confiabilidad del servicio a la poblaci\u00f3n.<\/p>\n\n\n\n<p>Marco Torres se\u00f1al\u00f3 que bajo la orientaci\u00f3n del presidente Nicol\u00e1s Maduro y la Autoridad \u00danica para la recuperaci\u00f3n de Cumanacoa, M\/G Lockiby Belmontes, fueron atendidas las familias afectadas por el hurac\u00e1n Beryl, reactivando de manera inmediata tres pozos, uno en Barrio Blanco y dos en el sector La Granja, los cuales abastecen a 17 comunidades de la regi\u00f3n.<\/p>\n\n\n\n<p>\u00abEstuvimos caminando en cada uno de los sectores de Cumanacoa, junto con nuestras lideresas y l\u00edderes, primero revisando nuestras estaciones de bombeo y pozos para dar soluci\u00f3n inmediata con su reactivaci\u00f3n. Simult\u00e1neamente, se ejecutaron los trabajos en el r\u00edo Manzanares y la planta potabilizadora San Lorenzo, para lograr la orden del jefe de Estado, de activar toda la red de distribuci\u00f3n de agua\u00bb, acot\u00f3 el ministro de Aguas.<\/p>\n\n\n\n<p>Esta victoria temprana se logr\u00f3 gracias a la articulaci\u00f3n de la Fuerza Trabajadora de Hidrocaribe y el Poder Popular organizado, en un solo gobierno.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-2 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"960\" height=\"540\" data-id=\"10820\" src=\"https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2024\/07\/WhatsApp-Image-2024-07-08-at-08.12.03.jpeg\" alt=\"\" class=\"wp-image-10820\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"960\" height=\"540\" data-id=\"10819\" src=\"https:\/\/minaguas.gob.ve\/wp-content\/uploads\/2024\/07\/WhatsApp-Image-2024-07-08-at-08.12.02.jpeg\" alt=\"\" class=\"wp-image-10819\" \/><\/figure>\n<\/figure>\n","protected":false},"excerpt":{"rendered":"<p>La puesta en funcionamiento del sistema h\u00eddrico comprendi\u00f3 la construcci\u00f3n de dos fuentes de captaci\u00f3n de agua en el r\u00edo Manzanares, para obtener el 100 % de caudal e iniciar la potabilizaci\u00f3n del vital l\u00edquido. (Prensa MinAguas \/ HidroCaribe 08-07-2024)-. El Gobierno Nacional a trav\u00e9s del ministerio del Poder Popular de Atenci\u00f3n de las Aguas [&hellip;]<\/p>\n","protected":false},"author":28,"featured_media":10821,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[42,8,24,45],"class_list":["post-10818","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticias","tag-agua-potable","tag-nacionales","tag-pueblo-trabajador-del-agua","tag-regionales"],"_links":{"self":[{"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/10818","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/28"}],"replies":[{"embeddable":true,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=10818"}],"version-history":[{"count":0,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/10818\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/10821"}],"wp:attachment":[{"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=10818"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=10818"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/minaguas.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=10818"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}